Defining land as a residential red zone was done so using the following criteria: there is significant and extensive area wide land damage, the extent of the damage required an area-wide solution, engineering solutions would be uncertain, disruptive, not timely, and not cost-effective and the health and wellbeing of residents was at risk from remaining in the area for prolonged periods.